Cleveland Completes Successful Re-commission of Ma’aden Phosphate Chute

PHB Weserhutte has recently assigned Cleveland Cascades Limited to re-commission the Cascade Loading Chute for Ma’aden Phosphate Company, originally supplied in 2010 at their facility in Al Jubail, Saudi Arabia.

Loading Diammonium Phosphate (DAP) for distribution to India and Australia for use in the agricultural industry, the Cleveland Cascade Chute is an effective system, loading 1.5 million tonnes annually.

The chute is equipped with a rotating trimming spout that distributes the DAP into hard to reach areas underneath the hatch-coamings of ships. This maximises the available loading space as well as minimising loading times.

Gallery