During October the Cleveland Cascades CC937 System was installed and began operating in UST Luga Port, Russia.
The system is one of our 1150 sized chutes supplied for loading of Iron Ore Pellets.
The chute is fitted via a fixed head chute design to a tower ship loader and is 25 meters in length when extended and retracts to 5.4m.
The chutes is lined with Ceramic tiles throughout for abrasion protection.
The chute is also fitted with a trimming spout for accurate loading during topping off within a vessel hatch. The Trimming Spout can be seen in the images and video below.
The chute can be seen loading following completion of installation in the images and video below.