Cleveland Cascades begins commissioning in Spain

Cleveland Cascades Engineers have been overseeing one of our latest chutes being assembled and installed in Spain. Working together on a new project with CHIA, of Spain, a Cascade chute for Clinker handling is being installed onto a Mobile Ship Loader at Malaga Port.

Hot commissioning is ongoing, and CCL will look to feature some footage of loading with a follow up news story.

The initial vessel loading shows why the Cascade chute was selected for the project.  To ensure clean loading without significant dust emissions, which were previously an environmental issue for Malaga Port.

The system is featured on the Spanish Ports website, link below;

http://www.spanishports.es/texto-diario/mostrar/1491606/pionera-cinta-ecologica-transportadora-clinker-fym-heidelbergcement-carga-hoy-primer-barco-puerto-malaga

The chute provided is our 1100s Chute size, with a length of 20.5 meters in total. The chute will be used to load Clinker into vessels at rates from 650 to 800 metric tonnes per hour.

For further information on our range of Cascade chutes for bulk loading, please contact us at

enquiries@clevelandcascades.co.uk

or call us on +44 1642 753274

 

News

Cleveland Cascades News Stories covering latest projects, materials loading focus and market insight. Here we highlight some of our completed projects and commissioned systems along with technical information, images and loading footage.

Contact Us

Cleveland Cascades Ltd, Unit 22, Dukesway, Teesside Industrial Estate, Thornaby, Stockton-on-Tees, Cleveland, TS17 9LT, United Kingdom

Tel: +44 1642 753260

E-mail: enquiries@clevelandcascades.co.uk