Cleveland Cascades CC942 Chute is to be supplied to Batumi Port in Georgia for the ship loading of Fertilisers, Urea and Sulphur.
The cascade system will be fitted via a pivoting head chute onto a luffing boom.
The 18m 1350 sized chute has a capacity of 1,550 m3 per hour with nominal rates for this project required at 915 to 1528 m3 per hour. The chute Steel work is supplied painted to C5M Marine standard for corrosion protection as can be seen in the images in the gallery below.
The winch supplied for this system has also been fitted with a hand wind function for manual retraction should it be required.
The chute is supplied with a Trimmer Spout/Spoon which has approximately 1.5m outreach.
The cones and trimmer are fitted with a UHMW PE AS Liner for abrasion protection. The cones also incorporate an anti static earthing system as seen in the gallery below.
The system is supplied with stands for the trimmer, skirt and head chute with fork lift points for simple movement and storage on site.
The chute can be seen during the assembly phase in the images below.
Cleveland Cascades Ltd, Unit 22, Dukesway, Teesside Industrial Estate, Thornaby, Stockton-on-Tees, Cleveland, TS17 9LT, United Kingdom