We have engineers presently in Huelva, Spain, Villahermosa, Mexico, Terneuzen, Holland with further works planned for Services in Santos Brazil and Kuwait in the coming weeks.
The system is Huelva, Spain is one of our Free Fall Tube systems loading Copper Concentrates fitted with a Trimmer Outlet. The systems in Villahermosa, Mexico are loading Pet Coke. The system in Terneuzen is loading Soda Ash and a range of fertilizers.
Our experience shows that commissioning is no time to make short cuts. Any savings made by not including it in the project can be lost many times over by potential incorrect set up and sub-optimal loading. This can lead not only to reduced efficiency, but even damage or increased parts usage and maintenance costs.
Overloading and Under loading are common outcomes when the chute is incorrectly set up during installation and both can lead to significant problems and losses for the operator. Overloading can lead to material spills, which can damage the cones & shroud cover and result in airborne dust. Under filling the chute can allow material to flow too fast and may not only create dust & degrade the material, but worse, it can cause oscillation of the chute leading to premature parts wear.
Our engineers are experienced working in dry bulk applications across the globe from Europe to the Middle East, in North or South America or from Africa to Asia & Australia. Our engineers carry site safety passports, and hold the latest qualifications including CompEx Ex01 – Ex06 for handling potentially explosive products.
Each of the commissioning services will feature in future News Stories.
Some images of the systems can be seen in the gallery below.
Cleveland Cascades Ltd, Unit 22, Dukesway, Teesside Industrial Estate, Thornaby, Stockton-on-Tees, Cleveland, TS17 9LT, United Kingdom
Tel: +44 1642 753260