Cleveland Cascades to Supply 2 x Cascade Chutes to Qatar

Cleveland Cascades Ltd have accepted an order for 2 x identical systems to be supplied to Ras Laffan in Qatar.

 

These systems will be designed to load Sulphur at rates of up to 550 tonnes per hour for a stockpile loading application.

 

With the corrosive nature of Suplhur, the system will feature a painting specification to ensure steelwork protection. As Sulphur is also considered a high risk for explosion, the system will also be fitted with electrical components for hazardous areas following the necessary ATEX classification.

The two chutes will be our 1100 sized systems, suspended from a fixed interface with an extended length of 25.5m and will retract to approximately 6m.

Each chute will feature our GRP cones lined with UHMWPE anti static liner and fitted with an anti-static system throughout. At the base of the chutes there will be a skirt outlet for dust suppression.

 

The two systems are expected to dispatch to the customer in early 2025.

 

One of our previous Sulphur loading systems can be seen in the images below showing the expected results of the loading of Sulphur with the Cascade Chute:

 

News

Cleveland Cascades News Stories covering latest projects, materials loading focus and market insight. Here we highlight some of our completed projects and commissioned systems along with technical information, images and loading footage.

Contact Us

Cleveland Cascades Ltd, Unit 22, Dukesway, Teesside Industrial Estate, Thornaby, Stockton-on-Tees, Cleveland, TS17 9LT, United Kingdom

Tel: +44 1642 753260

E-mail: enquiries@clevelandcascades.co.uk