Cleveland Cascades to Supply System to Ras Al Khaimah, UAE.

Cleveland Cascades are to supply a system for loading Limestone to Ras Al Khaimah, UAE.

The system is to be one of our 1700 size systems designed to load Limestone at 3,300 metric tonnes or 2,445 cubic meters per hour. This size system is capable of loading up to 2800 cubic meters per hour.

The system is to include a pivoting style head chute mounted to a luffing boom shiploader. The extended length of the system is to be 18m with a retracted height of 7.5m.

The Head chute will be lined with CR2 hard faced tiles whilst the 1700 sized GRP cones are to be lined with 5mm hardox for abrasion protection.

Along with the main system a secondary spout is also to be supplied as a spare to allow for change over during maintenance and cleaning.

The system will be fitted with a full suite of electrical components for safety and automation.

Images of the designed system can be seen below in the gallery.

 

News

Cleveland Cascades News Stories covering latest projects, materials loading focus and market insight. Here we highlight some of our completed projects and commissioned systems along with technical information, images and loading footage.

Contact Us

Cleveland Cascades Ltd, Unit 22, Dukesway, Teesside Industrial Estate, Thornaby, Stockton-on-Tees, Cleveland, TS17 9LT, United Kingdom

Tel: +44 1642 753260

E-mail: enquiries@clevelandcascades.co.uk