Cleveland Ships Two Further Vehicle Loaders for use at Port of Tyne, UK

Following a shipment of four Vehicle Loading systems for use at the Port of Tyne in 2011, Cleveland Cacscades have this month delivered a further two systems for use at the same site. The Port of Tyne have recently up-scaled their biomass storage facility, which led to the requirement of two further CCL systems to be manufactured and eventually installed. When in service, the systems will handle biomass at rates of up to 620 tonnes per hour.

https://www.designingfaces.co.uk/order-prednisone/

News

Cleveland Cascades News Stories covering latest projects, materials loading focus and market insight. Here we highlight some of our completed projects and commissioned systems along with technical information, images and loading footage.

Contact Us

Cleveland Cascades Ltd, Unit 22, Dukesway, Teesside Industrial Estate, Thornaby, Stockton-on-Tees, Cleveland, TS17 9LT, United Kingdom

Tel: +44 1642 753260

E-mail: enquiries@clevelandcascades.co.uk