Following a shipment of four Vehicle Loading systems for use at the Port of Tyne in 2011, Cleveland Cacscades have this month delivered a further two systems for use at the same site. The Port of Tyne have recently up-scaled their biomass storage facility, which led to the requirement of two further CCL systems to be manufactured and eventually installed. When in service, the systems will handle biomass at rates of up to 620 tonnes per hour.
Cleveland Cascades Ltd, Unit 22, Dukesway, Teesside Industrial Estate, Thornaby, Stockton-on-Tees, Cleveland, TS17 9LT, United Kingdom
Tel: +44 1642 753260